İSKİ European Side Wastewater -Stormwater-Stream Reclamation Project and Quantity Preparation Services
Service Scope
Engineering Services
Location
İstanbul
History
2005-2008
Employer
İSKİ (Istanbul Water and Sewerage Administration)
Project scope
1,556.24 km Wastewater networks and collectors
528.37 km Stormwater networks and collectors
146.50 km Stream Improvement
146,50 km Stream Rehabilitation Map Measurement
Preparation of 1,273,936.54 m2 Expropriation Plan
23.17 km Wastewater tunnel and 4.48 km Seawater tunnel
Final Project of Sea Water Pumping Center, each with 400 Kw engine power (2 Main +1 Spare)
Final Project of Wastewater Pumping Center, each with 9 Kw engine power (1 Main + 1 Spare)