537.28 km (Ø200-Ø300) Wastewater networks and collectors
11.03 km (Ø2000-Ø2400) Wastewater tunnel Implementation plan
414.45 km (Ø300-Ø3000) Stormwater networks and collectors
10 m³/sec capacity Wastewater Pumping Center application projects
Preparation of hydraulic-p&i-electrical-mechanical-construction application projects and tender documents of Tuzla Advanced Biological Wastewater Treatment Plant with a capacity of 225,000 m³/day and Inlet Pumping Center (Part 1, 2nd Stage with a capacity of 75,000 m³/day)
Preparation of reinforced concrete and static projects and calculations of 19 streams
Preparation of 69.71 km Expropriation Plan
Preparation of 382,84 ha landscape application projects and their project report, exploration and quantity preparation services.